Stay with us on social networks

About port

Port point was organized in the Bug estuary, which was awarded the title of "Oktyabrsk" by ministerial order of Navy of USSR from February 12, 1966 № 29.

Port point has been built on the left bank of the Dnieper-Bug estuary, at a distance of 1.5 miles from Nikolaev and 37.6 - from Ochakov.

In 1992 State Enterprise "Specialized sea port "Oktyabrsk" was founded, Order of the Ministry of Infrastructure of 17.10.2016 №354 renamed the State Enterprise "Stevedoring Company "Olvia".

According to the Cabinet of Ministers of Ukraine on January 25, 2017 №46 Specialized sea port "Oktyabrsk" renamed specialized sea port Olvia.

The port belongs to a group of ports in the North-West Black Sea. There are 8-ports: Belgorod-Dniester, Chornomorsk, Odesa, Yuzhny, Olvia, Мykolaiv, Kherson, Skadovsk.

Vessels approach into the port is carried out on the Dnieper-Bug-liman channel. According to the rules of navigation on the channel, the depth and length of the mooring line can accommodate vessels up to 230 meters in length, a width of up to 32.5 m, deadweight up to 80 thousands tons. Project depth at the berths - from 9.75 m to 11.5 m, but straight depth of BDLC restricts the capabilities of the enterprise for receiving vessels is 10.3 m.